Southern Water – Sandown Water Treatment Works

The ChallengeFollowing planned preventative maintenance at Southern Water’s Sandown site, it was discovered that the hoist used to remove their storm pumps did not meet the HSE’s Lifting Operations and Lifting Equipment Regulations 1998 (LOLER). The hoist was therefore taken out of service.It was imperative that the hoist was quickly…

Continue ReadingSouthern Water – Sandown Water Treatment Works

Southern Water – Monxton Wastewater Pumping Station

The Challenge Due to a lack of maintenance, the hoist used to remove pumps at Southern Water’s Monxton site no longer met the HSE’s Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) and was therefore unsafe for use. Southern Water needed a safe-to-use hoist before they could continue removing and…

Continue ReadingSouthern Water – Monxton Wastewater Pumping Station