Cross Rail

The TaskDue to the completion of the tunnelling works by BBMV for the Crossrail Project, Keltbridge were appointed to clear the Whitechapel Site. Consequently, Street Cranexpress were invited to tender for the removal of the Kunz crane (tunnelling crane) and a 50t overhead crane which were housed in the acoustic…

Continue ReadingCross Rail

Southern Water – Sandown Water Treatment Works

The ChallengeFollowing planned preventative maintenance at Southern Water’s Sandown site, it was discovered that the hoist used to remove their storm pumps did not meet the HSE’s Lifting Operations and Lifting Equipment Regulations 1998 (LOLER). The hoist was therefore taken out of service.It was imperative that the hoist was quickly…

Continue ReadingSouthern Water – Sandown Water Treatment Works

End of content

No more pages to load